EasyManua.ls Logo

RBI Gas boilers - Commissioning Checklist

RBI Gas boilers
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finned copper tube gas boilers & water heaters – Boiler Manual
Fi
nne
d
co
pp
er tu
b
e gas
b
o
il
ers
&
water
h
eaters –
B
o
il
er
M
anua
l
41
F
CO
M
BU
STI
O
N
A
N
AL
YSIS
LL
MINIM
U
M
F
IR
I N
G
R
A
TE
A
A
1
00%
F
IR
IN
G
R
A
TE
A
A
GAS PRESSURE AT SUPPLY TEST PORT INCHES WC I NCHES WC
C
O
2
%
%
O
2
%
%
CO
(
PPM
)
PP
M
PPM
NET
S
TA
C
K TEMPERAT
U
R
E
o
F
o
F
MANIFOLD PRESSURE (WC) IN C HE S WC I N C HE S WC
S
A
F
E
TY
T
E
S
T
C
HE
C
K
L
I
ST
F
L
O
W SWITCHE
S
A
IR
S
WIT
CH
FLAME SAFEGUAR
D
L
OW WATER CUT-OFF
H
IGH LIMIT
S
C
O
MMISSIONIN
G
T
H
E
B
O
I
L
E
R
/WA
T
E
R
A
A
H
E
A
TER
A
A
U
NIT CYCLED MINIMUM
O
F 15 TIME
S
T
HE
D
ELTA T
B
ETWEEN THE HEATE
R
IN
-
LET AND
OU
TLET IS CRITICAL T
O
PR
O
P
-
ER FL
O
W
.
BEF
O
RE Y
OU
LEAVE THE
JO
B
-
S
ITE, Y
O
U MUST REC
O
RD THE DELT
A
T
.
T
HIS READING SH
O
ULD N
O
T EXCEED
3
5
o
F
, 19.4
o
C, N
O
R BE L
O
WER THAN 2
0
o
F
,
11
.
1
o
C.
D
ELTA T =
CUSTOMER INSTRUCTE
D
ALL COVERS REPLACE
D
C
UST
O
MER GIVEN MANUA
L
T
ARGET TEMPERAT
U
RE SET PER C
U
ST
O
ME
R
COMMISSIONED BY:
______________________________________
(
SIGNATURE
)
DATE: ___________________________
_
A
DD
I
TI
O
N
AL
N
O
TE
S
A
N
D
C
O
MMENTS
Verify that the piping and controls ensure the boiler return water temperature does NOT drop below 140°F,60°C. Operating
at lower return temperatures is likely to cause condensation in the primary heat exchanger, resulting in corrosion and possible
failure of the heat exchanger.

Related product manuals