EasyManua.ls Logo

recteq RT-590 - RT-590 Assembly; Step 3: Install Bottom Shelf; Step 4: Install Pull Bar Handle

recteq RT-590
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Install Bottom Shelf
Step 3
Align shelf (4) between grill legs and
attach using provided hardware.
Once bottom shelf is installed, fully
tighten all hardware.
Install Pull Bar Handle
Step 4
Attach the pull bar handle (6) using the hardware provided in the handle.
The beauty ring stays attached to the pull bar handle.

Related product manuals