Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The boiler will be subject to expansion and contraction during the start-up and cooling phases, therefore slight creaking noises may be
heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the boiler is not immediately overheated and the temperature is increased gradually, initially using
low power. This will prevent damaging the ceramic or serpentine tiles, the welds and the steel structure.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!
ATTENTION!
If during operation or initial ignition you encounter smoke spillage in to the room from the appliance
or the ue then please switch o the appliance, ventilate the room and contact the installation / service
engineer immediately.
OPENING/CLOSING THE DOOR
ATTENTION!
The door must be closed properly for the boiler to work correctly.
Use suitable protective clothing (such as gloves) to open the boiler door.
To open the door insert the supplied hook into the hole and lift the handle (as in the gure).
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
Once the power cable is connected in the rear part of the stove, turn the switch, also placed at the rear, to position (I). To switch the stove
on or o press key 1 on the control panel.
DOOR OPENING.