Effective from 29-Jul-21 Page | 1
Tools suggested: Step ladder, Saw-stools, Hammer, Rubber Mallet, Secateurs, Scissors, Hacksaw, Square, Tape measure,
Cordless or Electric drill, Level, String-line, Marker pen, Safety gear (as needed).
Select a site:
Choose a level site that offers some protection for the Tunnelhouse from strong wind. Face the door away from the pre-dominant
wind. We suggest you take your time and allow yourself a weekend to erect the frame and then fit the covering on a warm calm day.
For standard sites, place a 50x50mm x 450-600mm length ground peg at approximately 1m apart around the inside base rail of the
building. You can then screw the base rail to these pegs. See below Foundation and base rail(s)
If you wish to build an additional base frame:
The tunnelhouse is already supplied with alloy base rails, however if your ground is undulating you may wish to build an additional
base from 4 x 2 or 6 x 2 timber or some other material. The dimensions for the base are shown on page 2.
The dimensions shown are the inside measurements enabling the interior base rail of the tunnelhouse to match the inner edges of
your frame base. Check the level using a builder’s spirit level. Screw or use a bracket to secure the alloy base to your timber base.
Redpath Pacific Ltd
PO Box 9058
16 Bounty Place
Palmerston North 4414
Free Ph 0508-733-728
Question and Answer IconNeed help?

Do you have a question about the Redpath Tunnelhouse and is the answer not in the manual?

Summary

Site Selection and Preparation

Additional Base Frame Construction

Instructions for building an additional base frame from timber.

Stage 1: Base Rails and End Walls Assembly

Stage 2: Internal Hoops Positioning

Stage 3: Purlins and Bracing Assembly

Wall Bracing Installation

Stage 4: Cover Clipping Systems Installation

Lockstrip Clipping System Guide

Steps for using the Lockstrip system to attach tunnelhouse covers.

Duralock Clipping System Guide

Steps for using the Duralock system to attach tunnelhouse covers.

Tunnelhouse Cover Fitting

Door Cover Fitting Procedure

Instructions for fitting the cover to the door using the Duralock system.

Roof and Side Cover Fitting Procedure

Instructions for fitting the main roof and side covers to the structure.

End Wall Cover Fitting

Roof Vent Installation

Stage 5: Louvre Window Fitting

Stage 6: Door Installation

Door and Track Fitting Procedure

Detailed procedure for mounting the door and its track system.

Optional Shadecloth Accessory

Shadecloth Fitting Instructions

Instructions for positioning and tensioning the throw-over shadecloth cover.

Sidewall Louvre System Fitting

Aluminium Shelf Unit Installation

Step-by-step guide for installing shelf brackets and slats.

Optional Aluminium Shelf Units

Tunnelhouse Maintenance Guide

Redpath Tunnelhouse Specifications