EasyManua.ls Logo

REED 00 C50SS - User Manual

REED 00 C50SS
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
REED 00 MODEL: C50SS
TRAILER CONCRETE PUMP
OPER.
PAGE 00
PRE-OPERATION INSPECTION
The CONDITION of the unit prior to start-up is a very IMPORTANT factor as it directly
affects the operator’s safety as well as those around him. It should be a common practice
that the operator performs a general inspection of the REED 00 MODEL C50SS before
each day’s operation.
The purpose of the operator’s inspection is to keep the equipment in PROPER working
condition and to DETECT any sign of malfunction during normal operations between
scheduled maintenance checks.
DOWNTIME is COSTLY and can possibly be prevented by taking a few minutes prior to
start-up to do a thorough walk-around inspection. This inspection must be performed each
day before the unit is operated. Report any damage or faulty operation immediately.
Attach a sign, if need be, at the control panel which states ------ DO NOT OPERATE ------.
Repair any discrepancies before use.
Some major items to be considered for your inspection include the following:
1. OVERALL MACHINE CONDITION
External structural damage
Wheel lug nuts missing or loose
Brake line wiring, connection
Condition of tires, pits, tears, cuts, inflation
Decals, placards, warning signs
Missing, broken or damaged parts
Remote switch & cable condition
Gauges, Throttle control
2. HYDRAULIC SYSTEM
Loose or damaged hoses, tubing, fittings
Hydraulic leaks
REVISION:
Question and Answer IconNeed help?

Do you have a question about the REED 00 C50SS and is the answer not in the manual?

REED 00 C50SS Specifications

General IconGeneral
BrandREED
Model00 C50SS
CategoryConstruction Equipment
LanguageEnglish

Related product manuals