EasyManua.ls Logo

REED 5T - Page 7

REED 5T
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 15
3. Vertical Tracking Force (VTF)
adjustment (Figure 15):
a) Loosen the fixing bolt [3]
Rotate the armwand above the platter
and lower the arm with the cartridge
(Figure 15).
b) Set tonearm balance by sliding
counterweight frame [2] on the holder
[4].
c) After setting the balance fasten
counterweight frame [2] with a screw [5]
d) Screw in the counterweight weight [1]
forward by two segments. After VTA
setup (Step 4) finalize VTF using scales.
Figure 16
4. VTA (Vertical Tracking Angle)
adjustment (Figure 16):
a) Loosen fixing screw of VTA adjuster [1]
by rotating it half-turn counter-clockwise.
b) By using handle [2], turn dial of VTA
adjuster [3] counter-clockwise and keep
lowering tonearm’s body until tonearm’s
armtube will become parallel to the
platter (with LP)
c) Firmly fasten fixing bolt [1]
Make sure to check VTF setting using
scales.
d) Lift up the microlift.
Figure 17
5. Azimuth adjustment (Figure 17):
a) If you need to adjust azimuth, hold the
armwand cylinder [3] and loosen screws
[1a] and [1b] by using s=1.5mm Allen
key. By carefully turning handle [2] up or
down adjust azimuth and tighten [1a]
and [1b] screws.
1
2
3
3
1a
1b
2
5
4
2
1
3