4 Assemblage
4.2
4.3.1 Storage
If the fan is not installed and/or put into operation
immediately it must be stored in a dry place which is
free of vibrations.
In case of long-term storage please note the storage
and preservation instructions for motors.
4.3.2 Stand-by operation
In case of long-term standstill periods, please note
the relevant instructions for the storage of motors.
4.4 Installation site
The installation site must be level and have a
sufficient load bearing capacity. There must be
enough room for assembly and maintenance work.
The impeller must be easily accessible.