Rev. 02 – July 16
th
, 2009
8 Aircraft Ground Handling and Servicing
Aircraft Ground Handling and Servicing 8 - 15
(3) Now remove both upper cradle retaining screws. (4) The whole
radio rack assembly can be swung out of the cockpit frame (5) Pull
out the rack and disconnect all harnesses from the installed devices.
Assembly
Assembling is carried out in reverse order. Take great care that all
electrical harnesses are routed in the same manner as before
disassembling. Any change to the original layout may cause
malfunction or interferences. Check thoroughly that none of the
wirings are in touch with moving parts (i.e. throttle controls).
Only genuine wiring harnesses may be used for repair and
alterations, otherwise warranty and manufacturers liability will
be lost.