08
3. Cut out a rectangular area for the monitoring screen on the
mounting surface with a jigsaw.
5. Place the monitoring screen into the cut-out area and align the
mounting holes on the monitoring screen with the pre-drilled
screw holes.
6. Affix the monitoring screen on the mounting surface with the
included four self-tapping screws.
7. Re-attach the snap-fit Front Cover Plate to the monitoring screen.
4. Pre-drill four screw holes on the mounting surface with a drill.
Please choose a clean, dry, protected, and easily accessible indoor
location to install the monitoring screen. It is recommended to
mount the monitoring screen at eye level for easy access of
operational controls and battery information. The RJ45
Communication Port on the monitoring screen is accessible from
the back of the unit. Clearance of at least 2 inch (50 mm) behind the
unit is recommended to allow for the bending radius of the RJ45
Communication Cable that connects to the monitoring screen.
Before installing the monitoring screen, it is recommended to have
the following tools available:
Installation
2. Use the monitoring screen as a template to mark the screw holes
and trace the cut-out area on the mounting surface with a pencil.
1. Remove the snap-fit Front Cover Plate from the monitoring screen.
Mounting the Monitoring Screen
Preparation
Choosing an Installation Location
Pencil
Drill
Jigsaw
Phillips screwdriver