Ruijie RG-NBS3100 Series Switches Hardware Installation and Reference Guide Product Installation
25
On both sides of the chassis, fasten the fibers and twisted pairs to the cabinet cable management ring or cabling
chute.
For power cables, bundle them closely along the bottom of the chassis, in a straight line wherever possible.
3.7 Checking After Installation
Before checking the installation, switch off the power supply so as to avoid any personal injury or damage to the
component due to connection errors.
Check that the ground line is connected.
Check that the cables and power input cables are correctly connected.
Check that all interface cables are laid out inside the equipment room. In the case of external cabling, check that the
lightning resistance socket or network interface lightning protector is connected.
Check that sufficient airflow is available around the device (over 10 cm).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Reyee Ruijie RG-NBS3100 Series and is the answer not in the manual?

Reyee Ruijie RG-NBS3100 Series Specifications

General IconGeneral
BrandReyee
ModelRuijie RG-NBS3100 Series
CategorySwitch
LanguageEnglish