EasyManua.ls Logo

Rheem 871026 - Page 39

Rheem 871026
77 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM031 Integrity 18, 20, 24, 26L Service Instructions REV: B
D.O.I: February 2008
This document is stored and maintained electronically by Service. All printed copies not bearing this statement in RED are deemed “uncontrolled
39
Fault Finding Tests 9 13
Isolate power when conducting resistance tests. “Live” components present
during voltage tests, exercise caution
Tests 9 and 10 Diagnostic Point 4
Test 11
Diagnostic Point 4
Conduct test with water flowing
Test
Check Point
Measured Value
Isolate power before removing
connector plugs
Unplug connector J from the PCB and select
maintenance information 0y on the L.E.D
display.
If 01-07 is displayed the PCB has failed. If 00
is displayed there may be current leakage to
earth
9
4 Blue 6 White
DC120 -160V
3 Red 4 Blue
DC11 -19V
10
1 Yellow 4
Blue
DC4 10V
(or measurement by
pulse counter of not
less than 4800
pulses per minute)
Test 12 - Diagnostic Point 9
Test 13 - Diagnostic Point 12
Conduct test with no water flow
Measure the voltage between terminals 1, 2
and 3 on connector J and earth. Voltage should
be between AC2 20V
Conduct test with water flowing
When ignition sequence commences, normal
voltage should be between AC 85 - 110V
until flame is detected.
(Note: Duration is approximately 3 seconds)

Table of Contents

Related product manuals