EasyManua.ls Logo

Rheem Raypak Delta Limited 399B - Maintenance Schedule; Suggested Minimum and Preventive Maintenance

Rheem Raypak Delta Limited 399B
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
Suggested Minimum
Maintenance Schedule
Regular service by a qualied service agency and
maintenance must be performed to ensure maximum
operating e󰀩ciency.
Maintenance as outlined below may be performed by
the owner.
Daily
1. Check that the area where the heater is installed
is free from combustible materials, gasoline, and
other ammable vapors and liquids.
2. Check for and remove any obstruction to the ow
of combustion or ventilation air to heater.
Monthly
1. Check for piping leaks around circulators, mixing
valves, relief valves, and other ttings. If found,
repair at once. DO NOT use petroleum-based
stop-leak compounds.
2. Visually inspect burner ame.
3. Visually inspect venting system for proper func-
tion, deterioration or leakage.
4. Check air vents for leakage.
Yearly (Beginning Of Each Heating
Season)
Schedule annual service call by qualied service
agency.
1. Visually check top of vent for soot. Call service
person to clean. Some sediment at bottom of vent
is normal.
2. Visually inspect venting system for proper func-
tion, deterioration or leakage.
3. Check that area is free from combustible mate-
rials, gasoline, and other ammable vapors and
liquids.
4. Check for and remove any obstruction to the ow
of combustion or ventilation air to heater.
5. Follow pre-start-up check in the Start-up section.
6. Visually inspect burner ame. It should be light
blue. Remove and visually inspect hot surface
ig-niter and sensor for damage, cracking or debris
build-up.
7. Check operation of safety devices. Refer to
manu-facturers’ instructions.
8. Follow oil-lubricating instructions on circulator
if required. Over-oiling will damage circulator.
Water-lubricated circulators do not need oiling.
9. To avoid potential of severe burn, DO NOT REST
HANDS ON OR GRASP PIPES. Use a light touch;
return piping will heat up quickly.
10. Check blower and blower motor.
11. Check for piping leaks around circulators, relief
valves and other ttings. Repair, if found. DO NOT
use petroleum-based stop-leak.
12. Clean air lter.
Periodically
1. Check relief valve. Refer to manufacturer’s
in-structions on valve.
2. Test low water cut-o󰀨, if used. Refer to manu-
fac-turer’s instructions.
3. Clean intake screen, vent terminal screen and air
lter.
Preventive Maintenance
Schedule
The following is required procedure in CSD-1 states
and good practice for all Delta Limited installations.
Daily
1. Check gauges, monitors and indicators.
2. Check instrument and equipment settings. (See
“Post Start-Up Check” on page 44.)
3. Check burner ame. (Should see light blue ame).
47
APPROVED
UNCONTROLLED DOCUMENT IF PRINTED

Related product manuals