2.5 CLEARANCES
All units are designed for “0” inches clearance to combustible material on all cabinet
surfaces.
Units with electric heat require a one inch clearance to combustible material for the
first three feet of supply plenum and ductwork.
Some units require a combustible floor base depending on the heating kW. The fol-
lowing table should be used to determine these requirements:
Additionally, if these units are installed down-flow, a combustible floor base is
required. See Accessories for Combustible Floor Base RXHB-XX.
Units with electric heating kW equal to
or less than the values listed in the table do
not require a combustible floor base.
Vertical units require clearance on at least one side of the unit for electrical connec-
tions. Horizontal units require clearance on either top or bottom for electrical connec-
tions. Refrigerant and condensate drain connections are made on the front of the unit.
(See Figure 4.)
All units require 24 inches maximum access to the front of the unit for service.
These units may be installed in either ventilated or nonventilated spaces.
FIGURE 4
DIMENSIONS FOR FRONT CONNECT COIL
Model Cabinet Size 21 24
Maximum Model Designation kW 18 20