EasyManuals Logo

RHINO SE4 User Manual

RHINO SE4
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #115 background imageLoading...
Page #115 background image
OPERATION
SE4 05/05 Operation Section 4-35
© 2005 Alamo Group Inc.
OPERATION
Reduce speed before turning or applying the
brakes. Ensure that both brake pedals are locked
together when operating on public roads.
OPS-U- 0023
13.3 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and
gross weight of the complete loaded unit. Ensure
that the load will be in compliance with the legal
limits set for the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the
proper equipment required. Using adequately
sized chains, heavy duty straps, cables and/or
binders, securely tie down both the front and rear of
the tractor utilizing the proper tie down locations as
specified by the tractor manufacturer.
OPS-U- 0025

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the RHINO SE4 and is the answer not in the manual?

RHINO SE4 Specifications

General IconGeneral
BrandRHINO
ModelSE4
CategoryLawn Mower
LanguageEnglish

Related product manuals