Do you have a question about the Riello VOKERA VISION PLUS 25C and is the answer not in the manual?
Boiler Type | Combi |
---|---|
Type | Combi |
Fuel Type | Gas |
Fuel | Natural Gas |
Mounting | Wall Mounted |
Output | 25 kW |
Flow Rate | 10.2 L/min |
Weight | 32 kg |
Warranty | 5 years |
Domestic Hot Water Output (kW) | 25 kW |
Efficiency Rating | A Rated |
Efficiency | 93% |
Ensures compliance with Gas Safety (Installation and Use) Regulation (UK).
Appliance must be correctly connected to the electrical supply.
Details the boiler's control panel, LCD display, and icons.
How to change the operating status: WINTER, SUMMER, or OFF.
How to set the heating water temperature when no outdoor sensor is fitted.
How to adjust heating temperature with an outdoor sensor.
How to adjust the domestic hot water temperature using the control panel.
List of boiler fault codes, their faults, and alarm types.
Immediate actions to take if a gas leak is suspected.
Explains how the boiler operates when a heating request is received.
Explains how the boiler operates when a domestic hot water request is received.
Lists the safety devices ensuring safe operation of the appliance.
Requirements for the gas supply, meter, and pipework installation.
Guidelines for the correct installation and positioning of the flue system.
Requirements for the electrical supply, fuse, and connection method.
Steps for preparing the mounting surface and marking bracket positions.
Instructions for fitting the flue system, including concentric and rear flue options.
Connecting the gas and water service valves to the appliance.
Connecting the 15mm gas service valve.
Connecting the 22mm service valves for flow and return connections.
Connecting the boiler to the electrical supply via a fly-lead or direct connection.
Connecting the 230V mains supply cable to the appliance.
Description of the control panel's LCD display and button functions.
Overview of the programmable parameters and their access levels.
Steps to follow before supplying power and starting the boiler.
Accessing and configuring boiler settings via menus P1, P3, and P4.
Steps required before supplying gas and electrical supply to the appliance.
How to change the boiler's operating status between WINTER, SUMMER, and OFF.
How to set the heating water temperature when no outdoor sensor is fitted.
Adjusting heating temperature when an outdoor sensor is connected.
Adjusting domestic hot water temperature via the control panel.
Inspection of gas supply, testing for tightness and purging.
Steps for initially filling the heating system and venting air.
Procedure for flushing the heating system both cold and hot.
Essential checks before attempting initial lighting of the appliance.
Procedure for checking gas pressure and performing a combustion analysis.
Ensuring continued safe operation and the importance of genuine spare parts.
Checklist for routine annual servicing of the appliance.
Procedure for replacing the gas valve unit.
Procedure for removing and replacing the main heat exchanger.
Ensuring continued safe operation through commissioning procedures.
Procedure for checking gas pressure and performing a combustion analysis.
Essential electrical checks to be performed by a qualified person.
Testing earth continuity of the appliance and cable connections.
Testing for short circuits between Live, Neutral, and Earth connections.
Performing voltage tests to check electrical polarity.
Checking the resistance to earth of the appliance.
Procedure for fault finding, including electrical checks and external control disconnection.
Procedures for adjusting maximum/minimum power settings and fan speeds.
Explanation of display icons, fault codes, and reset procedures.
Procedure for converting the boiler from natural gas to LPG.