DRAINING THE UNIT
WARNING:
Before draining the unit, ensure the appliance has been switched off, and
water is not hot enough to scald.
To drain 3-25L models, turn unit off and open tap until no water flows out. Remove
unit from wall and tip over with tap open until unit is empty. For 40L units, a drain
plug is accessible from the bottom of the unit (note switch unit off before draining)
TAP OUTLET
To prevent damage during transport, the tap is packed inside the unit housing. For
the AR3, AR5 and AR10 units, remove the four screws located on the top and
bottom of the unit and slide the housing toward you. For AR15, AR25 and AR40
models, unscrew and remove the access panel on the left hand side of the unit.
The tap is connected to the tap extension by a chrome-plated nut and tightened
using a 29 mm AF spanner.
ELECTRICAL REQUIREMENTS:
WARNING:
If this boiling water unit is to be installed in a newly constructed building, ensure
that all electrical tests including insulation tests have been performed prior to
plugging in and switching on your new Boiling Water Unit. Failure to do so could
damage the electronics.
220 –240 Volts AC, 50 Hz, Single Phase
10 Amps on 3, 5, 7.5,10 & 15 litre models
15 Amps on 25 litre model
20 Amps on 40 litre model
A flexible cord complete with a plug is supplied on AR3-AR15 models. Do not
loosen the cord grip or pull excess cord into the water boiling unit. If the supply cord
of this unit is damaged, it must be replaced by Roband or a qualified service
person.
The 25 and 40 litre models must be installed with fixed wiring. A means of
disconnection from all active (phase) conductors of the power supply must be
incorporated during installation in accordance with the wiring rules.