EasyManua.ls Logo

Robin EH18V OHV - Break-in Operation

Robin EH18V OHV
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-5
BREAK-IN OPERATION
An
engine that has been completely overhauled by being fitted with a new piston, rings, valves and
connecting rod should be thoroughly
RUN-
IN
before being put back into service.
Good bearing surfaces and running clearances between the various parts can only be established
by
operating
the
engine under reduced speed and loads
for
a short period
of
time.
While the engine is being tested, check for oil leaks.
Make final carburetor adjustment and regulate the engine operating speed.
I
Steps
Load Engine speed Time
Step
1
60
min
3000
rpm
4.0
HP
Step
4
30
rnin
3000
rpm
2.0
HP
Step
3
10
min
3000
rpm
No
load
Step
2
10
min
2500
rpm
No
load
-
40-

Related product manuals