EasyManua.ls Logo

Robot Compact PRO - Page 25

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manifolds Manual 23
5. If there is sufcient pressure in the
underoorheatingsystem,youcanventeach
group separately by opening the group valve
and venting through the venting point at the
same time.
6. Close the group valve concerned af-
ter venting is completed and repeat this
procedure for any following groups.
After all groups and manifold have been fully
vented,makesurethatthereissufcientpres-
sure left in the system.
7. Put the plug into the earthed wall socket af-
terllingandventingthesystem.
NOTICE:
Pump must be vented. Check appendices Wilo
Para HU 25/6
Schematic total overview
Installing/mounting