7. Commissioning/decommissioning
Setting the manifold
7.1 Putting into operation/setting the manifold
24 Manifolds Manual
4. Open the return valve.
6. Gradually open the thermostatic control of
the supply water by approx. 5°C per week
untilitreachestherequiredunderoorwater
temperature(usually40°C).
7. Theoorsupplytemperaturecanberead
from the thermo-mano gauge. The oor
return temperature can be read from the
temperature gauge.
1. Open the group valve. If the group lengths
vary widely, the groups must be set separately
(mountingowmetersunderthegroupvalves
willmakeiteasiertoseteachgroupseparately).
2. The return valves are provided with a
pre-set function. You can remove the white
manual handle to set the volume ow by
using the pre-set function. You can use the
same key that you have used for venting the
manifold.
3. When leaving the factory, the pump is
by default set in its recommended position,
namely ‘Autoadapt’. This setting is suitable
for most systems.
If required, you can customise the setting of
the pump in accordance with the instructions
set out in the appendix.