EasyManua.ls Logo

Rohde & Schwarz R&S FSH - Manual Adjustment Procedures

Rohde & Schwarz R&S FSH
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S FSH Adjustment
1145.5973.82 2.5 E-11
Adjustment
This section describes the measurement equipment and accessories required for the manual
adjustment of the R&S FSH, the appropriate preparations of the equipment, and the individual
adjustments.
An adjustment program provides the instructions for the input settings.
Adjustment Instructions
The adjustment of the analyzer must be performed after a warm-up time of at least 30 minutes. Only
by adhering to this requirement can compliance with the guaranteed data be ensured.
Inputs for setting the R&S FSH during adjustment will be programmed automatically.

Related product manuals