R&S FSH  Adjustment 
1145.5973.82 2.5  E-11 
Adjustment    
This section describes the measurement equipment and accessories required for the manual 
adjustment of the R&S FSH, the appropriate preparations of the equipment, and the individual 
adjustments. 
An adjustment program provides the instructions for the input settings. 
 
Adjustment Instructions 
• The adjustment of the analyzer must be performed after a warm-up time of at least 30 minutes. Only 
by adhering to this requirement can compliance with the guaranteed data be ensured. 
• Inputs for setting the R&S FSH during adjustment will be programmed automatically.