-------
-----
Rolls-Royce
& Bentley
---
--
--
Air
Conditioning
System
Manual
Attach the blower motor leads and the transfer
duct
thermostat
leads to
their
respective
connectors.
Connect the pipes between the expansion
valves and the solenoid valves.
Secure the evaporator return pipe union
at
the
valance Tee junction.
Evacuate and sweep the system, then check for
leaks (refer to the appropriate Sections).
Charge the system with 7 lb.
of
refrigerant (see
appropriate Section).
Fit the wing.
Check and,
if
necessary, reset the actuator
adjustment.
Page
31