4 x Faults and malfunctions
4.2 Malfunctions
Malfunction Possible cause Possible solution
System not working
(Operation LED off, noth-
ing on the display)
No mains voltage
Ɣ Switch main switch of system on.
Ɣ Switch on system fuse(s).
Ɣ Replace system fuse(s).
Program clock is not
working or programmed
switching times have
been carried out at the
wrong time.
Time or weekday have not been set correctly.
Ɣ Set the clock
Ɣ Set the weekday
Program clock is deactivated. Ɣ Activate program clock.
During a switching time the user made a man-
ual setting (e.g. changed the target tempera-
ture, changed the operating mode)
Ɣ Deactivate program clock and activate it again.
Ɣ Select correct operating mode.
Control unit does not
respond to entries
Operating system of control unit crashed.
Ɣ Carry out RESET of control unit.
Ɣ Restart system (mains voltage).
Operating data are not
updated
Operating system of control unit crashed.
Ɣ Carry out RESET of control unit.
Ɣ Restart system (mains voltage).
Ɣ Have the system checked by a ROTEX heating
technician.
Heating does not warm
up
Room heating standby switched off (e.g. time
program is in the economy phase, outside
temperature is too high, parameters for
backup heater (BUH) are set incorrectly,
requirement for hot water is active)
Ɣ Check the operating mode setting.
Ɣ Check the request parameters.
Ɣ Check the setting of time a weekday in the control
system.
Refrigerant compressor is not working.
Ɣ With installed backup heater:
Check that the backup heater (BUH) is heating the
water temperature to at least 15 °C (with a low water
temperature, the system uses the backup heater
(BUH) first to attain the minimum water temperature).
If applicable, check the power supply, thermal
protection and overheating fuse for the backup heater
(BUH).
Ɣ Have the system checked by a ROTEX heating
technician.
System is in the operating mode "cooling". Ɣ Switch the operating mode to "heating".
Settings for off-peak mains connection do not
correspond to settings for electrical connec-
tions.
Ɣ HT/NT function is active and the parameter [HT/NT
Contact] is set incorrectly.
Other configurations are also possible. However,
these must match the type of off-peak mains
connection.
Ɣ The parameter [SMART GRID] is active and the
connections are set incorrectly.
The energy supply company has sent the off-
peak rate signal.
Ɣ Wait for the repeat off-peak rate signal which reacti-
vates the power supply.

Other manuals for Rotex HPSU compact (V5)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotex HPSU compact (V5) and is the answer not in the manual?

Rotex HPSU compact (V5) Specifications

General IconGeneral
BrandRotex
ModelHPSU compact (V5)
CategoryHeat Pump
LanguageEnglish

Related product manuals