EasyManua.ls Logo

ROUSH F-150 2021 - Page 12

ROUSH F-150 2021
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2021 ROUSH Performance F-150 Service Manual
9
2021 ROUSH Performance F-150 Service Manual
10. Tighten the bolts on the OEM Y-pipe ange. Torque to 40 Nm (29.50 ft-lb).
11. Slide the muer until it is positioned so you can see the mark made in step 4 of this procedure. Tighten the
clamps to keep the pipes from moving.
12. Install the takeoff hanger as shown onto the 3" over-axle pipe (PT00038892).
13. Install the supplied hanger (1115-5A204) onto the dual exhaust tip (PT00038638).
14. Slide a 3" clamp (10-0439) on the tip and slide onto over-axle pipe (PT00038892). Install the hanger onto the
passenger side frame rail with the over-axle exhaust pipe and tip attached.
15. Install the 3" over-axle pipe onto the muer and slide the hanger onto the leaf spring shackle bolt. Snug up
the shackle bolt so that the pipe is supported. Do not torque yet.
16. Align tips to your liking, and starting at the front, tighten the clamps making sure everything is aligned to 55
Nm (40.57 ft-lb).
17. With the vehicle on the ground, torque the spring shackle bolt to 235 Nm (173.33 ft-lb).

Related product manuals