4 System Debugging
4.1 Setting up a Debugging Environment
Use a power adapter or PoE to power the AP.
Setting up the Environment
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected to a PC for debugging, verify that the PC and PoE switch are properly grounded.
4.2 Powering up the AP
4.2.1 Checking before power-up
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
4.2.2 Checking after power-up (recommended)
After powering up, it is recommended that you check the following to ensure normal operation of the AP.
Check if any message is printed on the Web-based configuration interface of the AC.
Check if the LED works normally.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie RG-AP820-L(V2) Series and is the answer not in the manual?

Ruijie RG-AP820-L(V2) Series Specifications

General IconGeneral
BrandRuijie
ModelRG-AP820-L(V2) Series
CategoryWireless Access Point
LanguageEnglish

Related product manuals