MODEL 51240B/53540B/53640B/61240B/63540B/63640B
10
D. Pipeline installation, take 63640B (F112A3) as example
① Install control valve
a. As the Figure 1-2 shows, insert the riser pipe to the bottom strainer and
put it into the bottom of the tank.
b. Fill the mineral to the tank, and the height is accordance with the design
code. Assemble the top strainer.
c. Connect the control valve and support with screw.
d. Choose the suitable position to install the valve. Using DN80 (Outer
diameter is φ90) UPVC pipe to connect top and bottom strainer connectors
with tank’s top and bottom strainers.