EasyManua.ls Logo

SABROE SAB 233 S - User Manual

Default Icon
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SAB 193-233-283 S A-frame (including ATEX)
Screw compressor units
Engineering manual EN

Table of Contents

Questions and Answers

Summary

Safety Precautions

General Safety Precautions

Essential safety measures for operation, maintenance, and work area.

Safety During Maintenance and Service

Procedures and precautions for performing maintenance safely.

Electrical Installation Safety

Safety measures for electrical installations, including ATEX compliance.

Lubricating Oils and Refrigerant Safety

Guidelines for safe handling of oils and refrigerants.

First Aid Measures

Provides first aid guidance for ammonia and HFC/HCFC exposure.

Technical Description

Screw Compressor Description

General overview of the screw compressor unit, its design, and components.

Control System (UniSAB III)

Details on the UniSAB III control system's features and capabilities.

Compressor Lubrication Systems

Functions and types of lubrication systems used in the compressor.

Technical Data

Motor Selection and Starting Torque

Guidance on motor sizing, starting torque, and torque curves.

Vibration and Test Pressure Levels

Standards and data for compressor vibration and pressure testing.

Installation Instructions

Personnel and Tool Requirements

Specifies required personnel qualifications, tools, and safety equipment.

Alignment Procedures

Detailed instructions for aligning the compressor, motor, and unit.

Foundation and Damping Methods

Options for unit foundations and vibration damping techniques.

Coupling Mounting Instructions

Procedures for mounting and installing the motor-compressor coupling.

Pressure Testing Procedures

Steps and safety measures for pressure testing the refrigeration plant.

Refrigeration Plant Evacuation

Procedure for evacuating the plant of air and moisture.

Final Installation Check

A checklist for verifying correct installation before operation.

Maintenance Instructions

Safety Precautions for Maintenance

Emphasizes reading safety precautions before performing maintenance.

Compressor Unit Maintenance Schedule

Outlines daily, periodic, and major overhaul maintenance tasks.

Stopping and Starting Procedures

Instructions for stopping the compressor for short and long standstills.

Lubricating Oil Usage Rules

General rules for selecting, handling, and using lubricating oil.

Oil Analysis and Assessment

Importance of oil analysis, visual assessment, and sampling procedures.

Compressor Oil Charging

Caution and step-by-step procedure for charging lubricating oil.

Faultfinding Instructions

Troubleshooting Common Issues

Identifies common problems and their probable causes and solutions.

Transport Instructions

Transport Safety Precautions

Highlights dangers and safety measures to be observed during transport.

Handling and Loading Procedures

Instructions for handling, lifting, and loading the compressor unit safely.

Commissioning Instructions

Commissioning Safety Precautions

Emphasizes safety measures and reading precautions before commissioning.

Preparations for Commissioning

Includes final installation checks, personnel requirements, and documentation.

Refrigerant Evacuation and Charging

Procedures for plant evacuation and charging the specified refrigerant.

Commissioning Checklist

A comprehensive checklist for verifying installation and start-up steps.

Final Disposal

Summary

Safety Precautions

General Safety Precautions

Essential safety measures for operation, maintenance, and work area.

Safety During Maintenance and Service

Procedures and precautions for performing maintenance safely.

Electrical Installation Safety

Safety measures for electrical installations, including ATEX compliance.

Lubricating Oils and Refrigerant Safety

Guidelines for safe handling of oils and refrigerants.

First Aid Measures

Provides first aid guidance for ammonia and HFC/HCFC exposure.

Technical Description

Screw Compressor Description

General overview of the screw compressor unit, its design, and components.

Control System (UniSAB III)

Details on the UniSAB III control system's features and capabilities.

Compressor Lubrication Systems

Functions and types of lubrication systems used in the compressor.

Technical Data

Motor Selection and Starting Torque

Guidance on motor sizing, starting torque, and torque curves.

Vibration and Test Pressure Levels

Standards and data for compressor vibration and pressure testing.

Installation Instructions

Personnel and Tool Requirements

Specifies required personnel qualifications, tools, and safety equipment.

Alignment Procedures

Detailed instructions for aligning the compressor, motor, and unit.

Foundation and Damping Methods

Options for unit foundations and vibration damping techniques.

Coupling Mounting Instructions

Procedures for mounting and installing the motor-compressor coupling.

Pressure Testing Procedures

Steps and safety measures for pressure testing the refrigeration plant.

Refrigeration Plant Evacuation

Procedure for evacuating the plant of air and moisture.

Final Installation Check

A checklist for verifying correct installation before operation.

Maintenance Instructions

Safety Precautions for Maintenance

Emphasizes reading safety precautions before performing maintenance.

Compressor Unit Maintenance Schedule

Outlines daily, periodic, and major overhaul maintenance tasks.

Stopping and Starting Procedures

Instructions for stopping the compressor for short and long standstills.

Lubricating Oil Usage Rules

General rules for selecting, handling, and using lubricating oil.

Oil Analysis and Assessment

Importance of oil analysis, visual assessment, and sampling procedures.

Compressor Oil Charging

Caution and step-by-step procedure for charging lubricating oil.

Faultfinding Instructions

Troubleshooting Common Issues

Identifies common problems and their probable causes and solutions.

Transport Instructions

Transport Safety Precautions

Highlights dangers and safety measures to be observed during transport.

Handling and Loading Procedures

Instructions for handling, lifting, and loading the compressor unit safely.

Commissioning Instructions

Commissioning Safety Precautions

Emphasizes safety measures and reading precautions before commissioning.

Preparations for Commissioning

Includes final installation checks, personnel requirements, and documentation.

Refrigerant Evacuation and Charging

Procedures for plant evacuation and charging the specified refrigerant.

Commissioning Checklist

A comprehensive checklist for verifying installation and start-up steps.

Final Disposal

SABROE SAB 233 S Specifications

General IconGeneral
TypeReciprocating Compressor
Swept Volume233 m3/h
Shaft Speed1450 rpm
RefrigerantR22, R134a, R404A, R507
Speed1450 rpm

Related product manuals