3.2 Precautions during installation
▲
During installation, please observe that the two upright columns are parallel and vertical to the ground, and shall not be tilted.
▲
hydraulic hose and steel cable connection, the joint must be connected in place, so as to avoid oil leakage and steel cable loose.
▲
All bolts and nuts must be tightened to ensure fastening.
▲
No vehicles shall be placed during the test.
3.3 Installation steps
Step 1
:
Choose the suitable place
:
The lift is for indoor use only. It is installed on strong concrete, not installed on the expansion joint of the cement ground, and shall not be installed
on the ground floor of the two or high floor without the permission of the relevant building personnel.
Step 2
:
Determine the installation position and lift the hoist to the installation site with a crane.
Step 3
:
Disassembly package
<1>
:
The pre placed wood on the ground (wood thickness greater than 100mm), crane for packaging side below the bridge plate is placed on wood,
the purpose is to let off the ground at the bottom of the packing frame.
<2>: Remove the packing
:
<3>
:
Remove the connecting screws between the main bridge board and the packing rack. Hang the main bridge board with the crane and put it in