EasyManua.ls Logo

Saft STM 5-100 - Page 3

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Placing into service
4.1. Procedure before use 13
4.2. Commissioning cycle and water topping-up 13
5. Operation
5.1. Operating temperature 14
5.2. Two-level charge 14
5.2.1. Normal charge 14
5.2.2. Fast charge 14
5.2.3. Maintenance charge 14
5.2.4. Recommended charging method 15
5.3. Discharge 17
5.3.1. Discharge current 17
5.3.2. Voltage in discharge 17
6. Maintenance
6.1. Periodic maintenance 18
6.2. Topping-up operation 18
7. Repair and overhaul of batteries
7.1. Electrolyte specific density 19
7.2. Reconditioning 19
Appendix 1 STM 5-100 MR G RD equipped 20
Appendix 2 STM 5-100 MRE G RD equipped 21
Appendix 3 STM 5-140 MR G RD equipped 22
Appendix 4 STM 5-140 MR D RG equipped 23
Appendix 5 Accessories for the central filling system 24
Appendix 6 Basic specification for filling circuit hoses 25
Appendix 7 Basic specification for the cooling system hoses 26
Appendix 8 Basic specification for rigid connections 27
Appendix 9 Basic specification for distilled
or demineralized water 28

Table of Contents

Related product manuals