SUN_IS_ electrical_installation_v5.1_06092021
16
VI. INSTALLATION OF THE LIGHT SWITCH BOX
1. Measure the location of the hole for the box so that it is in the middle of the second vertical
paneling board (IMPORTANT) at a height of 56 cm from the underside of the bench. Pre-drill,
then use a chisel to deflect a piece of the framing board, then deepen the hole and again using
the chisel remove the piece of board.