24 EB 8111/8112 EN
Measures
Fig.8: Lifting points on the control valve
Lifting the control valve
1. Attach one sling to each ange of the
body and to the rigging equipment (e.g.
hook) of the crane or forklift (see Fig.8).
2. Carefully lift the control valve. Check
whether the lifting equipment and acces-
sories can bear the weight.
3. Move the control valve at an even pace
to the site of installation.
4. Install the valve into the pipeline (see sec-
tion5.2.3).
5. After installation in the pipeline, check
whether the anges are bolted tight and
the valve in the pipeline holds.
6. Remove slings.
We recommend using a hook with safety
latch (see Fig.8). The safety latch prevents
the slings from slipping during lifting and
transporting.