EasyManua.ls Logo

Samson 3321 - Preparation for Installation

Samson 3321
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 EB 8111/8112 EN
Measures
4.4 Preparation for installation
Proceed as follows:
Î Flush the pipelines.
The plant engineering company is responsi-
ble for cleaning the pipelines in the plant.
Î Check the valve to make sure it is clean.
Î Check the valve for damage.
Î Check to make sure that the type desig-
nation, valve size, material, pressure rat-
ing and temperature range of the valve
match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.).
Î For steam applications, make sure that
the pipelines are dry. Moisture will dam-
age the inside of the valve.
Î Check any mounted pressure gauges to
make sure they function.
Î When the valve and actuator are al-
ready assembled, check the tightening
torques of the bolted joints (uAB0100).
Components may loosen during trans-
port.
Note