EasyManua.ls Logo

Samsung AC BXADCH Series - Step 14 Performing Final Check and Trial Operation

Samsung AC BXADCH Series
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
English
Installation Procedure
2 Connect the flexible hose to the flexible hose port.
In damp hard soil rather than loose sandy or
gravel soil that has a higher earthing resistance.
Away from underground structures or facilities,
such as gas pipes, water pipes, telephone lines
and underground cables.
At least two metres away from a lightening
conductor earthing electrode and its cable.
NOTE
The earthing wire for the telephone line cannot be
used to ground the air conditioner.
Carbon plastic
19.69inch(50cm)
PVC-insulated
green/yellow
wire
To grounding screw
Steel core
11.81inch
(30cm)
Terminal M4
3 Finish wrapping insulating tape around the rest of the
pipes leading to the outdoor unit.
4 Install a green/yellow coloured earthing wire:
If the earthing wire is too short, connect an
extension lead in a mechanical way and wrap it
with insulating tape (do not bury the connection).
Secure the earthing wire in position with staples.
NOTE
If the earthing electrode is installed in an area with
heavy traffic, its wire must be connected securely.
5 Carefully check the installation by measuring the
earthing resistance with a earth resistance tester. If
the resistance is above the required level, drive the
electrode deeper into the ground or increase the
number of earthing electrodes.
6 Connect the earthing wire to the electrical component
box inside of the outdoor unit.
Step 14 Performing final check and
trial operation
1 Check the power supply between the outdoor unit and
the auxiliary circuit breaker.
1 phase power supply : L, N
2 Check the indoor unit.
a Check that you have connected the power and
communication cables correctly. (If the power
cable and communication cables one mixed up or
connected incorrectly, the PCB will be damaged.)
b Check that the thermistor sensor, drain pump/
hose, and display are connected correctly.
3 Press K1 or K2 on the outdoor unit PCB to run the test
mode and stop.
Key Push type Mode
Display
SEG 1 SEG 2 SEG 3 SEG 4
K1 Short
1st Heating test mode
2nd
Defrost test
mode
¹⁾
3rd End Key operation
K2 Short
1st
Cooling test
mode
2nd Inverter check
3rd Pump down
4th Unuesal
5th
Inverter Fault
Detection
(Comp#1)
²⁾
6th
Auto trial
operation
7th
Auto check
³⁾
(Installtion
commissioning
mode)
8th
End Key
operation
K3 Short 1st
Reset
Release Eco
mode
DB68-11274A-00_IM_CAC Universal Outdoor_AA_EN.indd 27DB68-11274A-00_IM_CAC Universal Outdoor_AA_EN.indd 27 2021-09-14 오전 9:22:012021-09-14 오전 9:22:01

Related product manuals