EasyManua.ls Logo

Samsung AC TXAP G Series - Page 18

Samsung AC TXAP G Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Installation Procedure
English
Installation Procedure
2 As shown in the figure, peel off the shields from the
rubber and wire of the power cable.
Peel off 20 mm of cable shields from the pre-
installed tube.
CAUTION
For information about the power cable
specifications for indoor and outdoor units, refer
to the installation manual.
After peeling off cable wires from the pre-installed
tube, insert a contraction tube.
If cable wires are connected without using
connecting sleeves, their contact area becomes
reduced, or corrosion develops on the outer
surfaces of the wires (copper wires) over a long
time. This may cause an increase of resistance
(reduction of passing current) and consequently
may result in a fire.
Power cable
(Unit: mm)
20 20 20
60
120
180
202020
60
120
180
Pre-installed
tube for the
power cable
3 Insert both sides of core wire of the power cable into
the connection sleeve.
Method 1: Push the core wire into the sleeve from
both sides.
Method 2: Twist the wire cores together and push
it into the sleeve.
Connection sleeve Connection sleeve
Method 1 Method 2
4 Using a crimping tool, compress the two points and
flip it over and compress another two points in the
same location.
The compression dimension should be 8.0.
Compression
dimension
After compressing it, pull both sides of the wire to
make sure it is firmly pressed.
Compress it 4 times.
5 mm
Compress it 4 times.
5 mm
Method 1 Method 2
5 Wrap it with the insulation tape twice or more and
position your contraction tube in the middle of the
insulation tape.
Method 1 Method 2
35 mm40 mm
Insulation tapeInsulation tape
6 Apply heat to the contraction tube to contract it.
Contraction tube
Contraction tube
Method 1 Method 2
CAC_R32_AU_Outdoor IM_EN_DB68-08522A-00_.indd 18 2019-08-19 오전 10:11:01

Related product manuals