EasyManua.ls Logo

Samsung AC071MN4PKH - Step 10 Installing the Drain Hose and Drain Pipe

Samsung AC071MN4PKH
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Installation Procedure
English
Pipe Pipe size
Insulation type (heating/cooling)
Remarks
Standard
(Less than 30°C, 85%)
High humidity
(Over 30°C, 85%)
EPDM, NBR
Liquid pipe
Ø6.35 to Ø9.52 9t 9t
The internal
temperature is
higher than 120°C.
Ø12.7 to Ø19.05 13t 13t
Gas pipe
Ø6.35 13t 19t
Ø9.52
19t 25t
Ø12.70
Ø15.88
Ø19.05
ŷ When installing insulation in the places and
conditions below, use the same insulation that is
used for high humidity conditions.
<Geological condition>
High humidity locations such as shorelines, hot
springs, lake or riversides, and ridges (when part of
the building is covered by earth and sand)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
Ceilings frequently exposed to moisture and cooling
are not covered. For example, pipes installed at a
corridor of a dormitory and studio or near an exit
that opens and closes frequently.
Places (where the pipes are installed) that are highly
humid due to a lack of ventilation.
Step 10 Installing the drain hose and
drain pipe
1 Push the supplied drain hose as far as possible over
the drain socket.
2 Tighten the metal clamp as shown in the picture.
3 Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with
clamps.
4 Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).

Other manuals for Samsung AC071MN4PKH

Related product manuals