EasyManua.ls Logo

Samsung AM***FNFDEH series - appendix; TROUBLESHOOTING

Samsung AM***FNFDEH series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E-18
Wiring Work (Continued)
5
Wrap it with the insulation tape twice or more and position your contrac-
tion tube in the middle of the insulation tape.
A total of three or more layers of insulation is required.
Method 1
Method 2
Insulation tape
35 mm
6
Apply heat to the contraction tube to contract it.
Contraction tube
7
After tube contraction work is completed, wrap it
with the insulation tape to finish.
Insulation tape
Insulation tape
40 mm
Make sure that the connection parts are not exposed to outside.
Be sure to use insulation tape and a contraction tube made of
approved reinforced insulating materials that have the same
level of withstand voltage with the power cable. (Comply with
the local regulations on extensions.)
In case of extending the electric wire,
please DO NOT use a round-shaped
Pressing socket.
- Incomplete wire connections can
cause electric shock or a fire.
NASA_Floor Stand_AM@@@FNFDEH@_IM_EN_03678A-05.indd 18 2016-05-09 오후 5:32:32

Other manuals for Samsung AM***FNFDEH series

Related product manuals