Grounding work
Grounding must be done by a qualied installer for your safety.
Grounding the power cable
The standard of grounding may vary according to the rated voltage and installation place of the air conditioner.
Ground the power cable according to the following table.
Power condition
Installation place
Voltage to ground is lower than 150V Voltage to ground is over 150V
High humidity
Must perform the grounding work 3.
Note 1)
(Including the case where earth leakage breaker is installed)
Average humidity Perform grounding work 3.
Note 1)
Must perform the grounding work
3.
Note 1)
(Including the case where earth leakage
breaker is installed)
Low humidity
Perform grounding work 3, if possible,
for your safety.
Note 2)
Note 1) About grounding work 3.
Grounding work must be done by an expert (with qualication).
Check if the grounding resistance is lower than 100. When installing a earth leakage breaker (that can cut the
electric circuit within 0.5 second in case of a short circuit), allowable grounding resistance should be 30~500.
Note 2) Grounding at dry place
The grounding resistance should be lower than 100. Even in worst case, grounding resistance should be lower
than 250.
Performing the grounding work
Use a rated grounding cable by referring to the specication of the electric cable for the outdoor unit.
When using the exclusive grounding terminal
(When the grounding terminal is already built on
the house)
When using grounding of the switch board
Exclusive grounding terminal
Distributing board