Refrigerant pipe installation
Tighteningare connection area
Check that the aring is properly made.
Align the center of the piping and sufficiently tighten the flare nut withngers. Finally, tighten theare nut with torque
wrench until the wrench clicks. When tightening the are nut with torque wrench, ensure the direction for tightening
follows the arrow on the wrench.
Make sure to use ester oil to coat the flare connection section.
Pipe
Flare nutFlare connection section
Outer diameter [mm (inch)]
Connection torque
Flare dimension [mm (inch)] Flare shape [mm (inch)]
kgf•cm N•m
Ø6.35 (1/4) 140~180 14~18 8.70~9.10(0.343~0.358)
R 0.4~0.8
(0.016~0.032)
90° ±
45° ±
Ø9.52 (3/8) 350~430 34~42 12.80~13.20(0.504~0.520)
Ø12.70 (1/2) 500~620 49~61 16.20~16.60(0.638~0.654)
Ø15.88 (5/8) 690~830 68~82 19.30~19.70(0.760~0.776)
Blowing Nitrogen gas should be done when brazing the pipe.
Make sure to use the providedare nut.
Make sure that there are no cracks on the bent pipe.
Do not fasten the flare nut with excessive strength.
Use ester oil to coat the flare connection area to prevent refrigerant leak. R410A is a high pressure refrigerant.
Therefore, there is a risk of refrigerant leakage if theare connection is not coated with ester oil.
CAUTION
AM0@@FXMDCH_IM_EN_03408A(1).indd 16 2013-03-04 오후 4:28:17