2
English
Contents
Safety Information 3
Safety Information 3
Installation 6
Preparation 6
Step 1-1 Viewing the typical installation 6
Step 1-2 Verifying model numbers 7
Step 1-3 Choosing the installation location 8
Step 1-4 Unpacking 11
Step 1-5 Preparing materials and tools 12
Indoor Unit Installation 14
Step 2-1 Attaching the mounting bracket to the wall 14
Step 2-2 Drilling the wall penetration 14
Step 2-3 Connecting the refrigerant pipes 15
Step 2-4 Connecting the power and communication cables 16
Step 2-5 Optional: Extending the power cable 17
Step 2-6 Connecting the drain hose 18
Step 2-7 Taping the pipes, cables, and drain hose 19
Outdoor Unit Installation 20
Step 3-1 Mounting the outdoor unit 20
Step 3-2 Connecting the cables and the pipes 21
Installation Inspection and Testing 22
Step 4-1 Performing a drain leak test 22
Step 4-2 Performing pressure tests using nitrogen 22
Step 4-3 Evacuating the system 23
Step 4-4 Adding refrigerant (if needed) 24
Step 4-5 Preparing the system for commissioning 24
Step 4-6 Commissioning the unit 24
Step 4-7 Performing final checks and trial operation 25
Sub PCB installation(optional) 27