EasyManua.ls Logo

Samsung DVM S AM180FXVAGH User Manual

Samsung DVM S AM180FXVAGH
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DVM S
AM✴✴✴FXVAGR Series
AM✴✴✴FXVAGH Series
AM✴✴✴HXVAGH Series
AM✴✴✴MXVNR Series
Air Conditioner
installation manual
imagine the possibilities
Thank you for purchasing this Samsung product.
DB68-03850A-14

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Samsung DVM S AM180FXVAGH and is the answer not in the manual?

Samsung DVM S AM180FXVAGH Specifications

General IconGeneral
ModelAM180FXVAGH
Cooling Capacity18.0 kW
Heating Capacity20.0 kW
RefrigerantR410A
Power Supply380-415V, 3Ph, 50Hz
TypeDVM S

Summary

Safety Precautions

Severe Warning Signs

Key warnings for severe injury or death, installation errors, and specific hazards.

Cautionary Instructions

Important cautions regarding installation, placement, and product handling to avoid damage or injury.

Base Construction and Installation of Outdoor Unit

Base Ground Construction

Detailed requirements for constructing a stable and level base for the outdoor unit.

Refrigerant Pipe Installation

Refrigerant Pipe Work

General guidelines for refrigerant pipe installation, including length and height difference limits.

Selecting Refrigerant Pipe

Guidance on choosing the correct pipe size based on capacity and length.

Pipe Sizing

Tables detailing pipe sizes for various outdoor unit capacities and configurations.

Additional Refrigerant

Additional Refrigerant Calculation

Method for calculating additional refrigerant based on pipe size and length.

Additional Refrigerant per Indoor Unit

Table detailing additional refrigerant amounts for each indoor unit based on capacity.

Electrical Wiring Work

Circuit Breaker and Power Cable Specifications

Table listing MCA and MFA values for circuit breakers and power cables for different models.

Power and Communication Cable Configuration

Diagrams illustrating cable routing and connection points for power and communication cables.

MCU and Pipe Address Setting

Post-Installation Checks

Installation Work Verification

Checklist for verifying outdoor and indoor unit installation, including security and ventilation.

Refrigerant Pipe Work Verification

Checklist for verifying pipe selection, connections, insulation, and refrigerant quantity.

Electrical Wiring Work Verification

Checklist for verifying power/communication cable tightening, cross-connections, and earthing.

Inspection and Test Operation

Precautions Before Test Operation

Safety measures to follow before starting inspection and test operations, including power-on time.

Auto Trial Operation Procedure

Procedure for conducting the auto trial operation and interpreting its results.

Automatic Refrigerant Amount Detection Function

Related product manuals