EasyManua.ls Logo

Samsung FQ159UST - Installation and Connection

Samsung FQ159UST
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
595
520
460
min 564
max 568
min
550
min 446
max 450
50
200 cm
2
6
Installation and Connection
This appliance is NOT intended for use in a commercial environment.
Please observe the installation instructions provided and note that this appliance should
only be installed by a qualified technician.
The appliance is fitted with a plug and must only be connected to a properly installed
earthed socket. The fuse protection must be rated at 16 amps (L or B-type miniature circuit
breakers).
In case a new socket is need, installation and cable connection must only be done by a
qualified electrician. If the plug is no longer accessible following installation, a pole discon-
necting device must be present on the installation site with a contact gap of at least 3 mm.
Adapters, multiway strips and extension cords must not be used. Overloading can result in
fire.
Plug in
When the appliance has been connected for the first time, all segments are lit for a second.
After 3 seconds, 12:00 flashes in the display prompting you to select the clock. Do not
forget to reset the clock when you switch to and from summer or winter.
FQ159ST-XSA-03150U_EN.indd 6 2007-04-09 ソタネト 2:02:49