Samsung Electronics36
To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.
1. Review all the following elements in the installation:
Installation site strength
Piping connection tightness to detect any gas leakages
Connection wiring
Heat-resistant insulation of the piping
Drainage
Earthing wire connection
Correct operations (follow the steps below)
Room select switch in the indoor unit
2. Apply the power to the outdoor unit.
- Check the fuse (250V~, 5A) : The fuse is opened when the power line (L, N) is short.
6-2 Checking and Testing operations
A unit
A unit
B unit
C unit
ON
ON
OFF
OFF
ON
OFF
OFF
ON
Room select switch
1(#51) 2(#52)
ROOM NO
INDOOR UNIT
Room select switch
(A, B, C unit)
DB98_16045A(4)_1 1/29/04 4:56 PM Page 36