EasyManua.ls Logo

Samsung RD160PHXEA User Manual

Samsung RD160PHXEA
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Air to Water Heat Pump
Air to Air Heat pump
installation manual
imagine the possibilities
Thank you for purchasing this Samsung product.
To receive more complete service, please
register your product at
www.samsung.com/register
Outdoor Unit
RD060PHXEA
RD070PHXEA
RD080PHXEA
RD110PHXEA
RD140PHXEA
RD160PHXEA
DB98-32661A(1)
IFSE P D
RD060PHXEA_IM_E_32661-1.indd 47 2010-07-26 ソタネト 3:33:50

Questions and Answers:

Samsung RD160PHXEA Specifications

General IconGeneral
BrandSamsung
ModelRD160PHXEA
CategoryHeat Pump
LanguageEnglish

Summary

Safety Precautions

Safety Precautions (Continued)

Additional safety measures and warnings for installation and operation.

Product Specification

Shape of the outdoor unit

Visual representation and identification of different outdoor unit models.

Accessories

List of supplied accessories with quantities for installation and use.

Locating the Units

Deciding on Where to Install the Outdoor Unit

Guidelines for selecting an optimal installation location for the outdoor unit.

Space Requirements for Outdoor Unit

Specifies necessary clearances and dimensions for outdoor unit ventilation.

Tools Required for Installation

Lists the essential tools needed for the installation process.

Moving the Outdoor Unit

Disassembling the Leg Base and Wood Palette / Fastening the Anchor Bolt

Steps to remove the base and secure the outdoor unit for installation.

Installing the Outdoor Unit

Outdoor unit base mount and anchor bolt position

Details on mounting the unit base and anchor bolt placement.

Installing the drain pipe

Instructions for correctly installing the unit's drain pipe.

Caution When Installing Cover for Heating Air Direction Change

Warning about potential damage to copper pipes during cover installation.

Installing the Refrigerant Pipe Work

Allowable Length of the Refrigerant Pipe and the Installation Examples

Guidelines on pipe lengths and system configurations.

Selecting the Refrigerant Pipe

Guidance on choosing appropriate refrigerant pipes based on unit capacity.

Selecting the Y-joint

Procedure for selecting Y-joints based on outdoor unit and indoor unit capacities.

Cutting or Flaring the Pipes

Steps for properly cutting and flaring refrigerant pipes.

Selecting the Insulation of the Refrigerant Pipe

Instructions for selecting and applying pipe insulation for optimal performance.

Insulating the Refrigerant Pipe

Detailed steps for insulating refrigerant pipes and joints.

Brazing the Pipe

Procedure for brazing pipes, emphasizing nitrogen gas usage.

Installing the Y-Joint

Guidance on installing Y-joints either horizontally or vertically.

Connecting the Outdoor Unit Pipe

Instructions for connecting pipes to the outdoor unit.

Performing the Refrigerant Gas Leak Test

Method for conducting a gas leak test using nitrogen.

Vacuum Drying

Process for removing moisture and air from the refrigerant system.

Selecting Additional Refrigerant Charge

Calculation method for additional refrigerant based on pipe length.

Refrigerant Charging

Procedures and specifications for charging refrigerant into the system.

Charging refrigerant

General instructions for adding refrigerant to the system.

Adding Refrigerant

Detailed steps for adding refrigerant in cooling and heating modes.

To Close the Valve Stem

Procedure for closing the valve stem on service ports.

To Open the Valve Stem

Procedure for opening the valve stem on service ports.

Electrical Connections

Overall System Configuration

Diagrams illustrating power cable connection for the entire system.

Specification of Electronic Wire of the Outdoor Unit

Details on power and earth cable specifications for outdoor units.

Power Wiring and Communication Wiring Configuration

Guidance on routing and securing power and communication cables.

Connecting the Power Terminal

Steps for connecting power cables to the terminal board.

Installing the Earth Wire

Instructions for proper installation of the earth wire for safety.

Setting the Option Switch and Function of the Keys

Option Switches in PBA of the Outdoor Unit

Overview of the main PCB option switches and their functions.

Key Function of the Outdoor Unit PBA

Explanation of the functions assigned to the keys on the outdoor unit PBA.

Function of K4

Detailed display contents and functions associated with key K4.

Indoor Unit Setup Range

Settings for indoor unit addresses and capacities.

Dip Switch Settings

Configuration settings for various dip switches related to system operation.

Pump Down Procedure

Objective of Pump Down

Purpose of the pump down operation for refrigerant recovery.

Cautions When Performing Pump Down

Important warnings and limitations during pump down operation.

Collecting Refrigerant in Refrigerant Vessel Before Pump Down Operation

Steps to reduce refrigerant quantity before pump down.

When refrigerant recovery is difficult due to the large amount of refrigerant

Procedure for recovering refrigerant when it is difficult.

Completing the Installation

Installation Completion Checklist

A checklist of final steps and checks after completing installation.

Final Checks and Trial Operation

Inspection Before Test Operation

Checks to perform on cables and power supply before trial operation.

Test Operation

Steps to run and inspect the unit's operation after installation.

Troubleshooting

Outdoor Unit

Table of error codes displayed on the outdoor unit PCB and their meanings.

Related product manuals