25
Part name Work sequence Remarks
Door
1. Pull the water tank and remove it.
2. Unfasten the two screws from the
guide rail and remove the shelf.
3. Remove the FOAM-PEs (4 provided)
from the shelf.
4. Assemble in the reverse order of
disassembly.
3-8. Assembly Water Tank Disassembling
3. How to install