10. Installation
7. When installing multiple outdoor units at the same place, construct a H beam or an anti-vibration frame on the
base ground to install the outdoor unit.
8. After installing a H beam or an anti-vibration frame, apply corrosion protection and other necessary coating.
9. When concrete construction for outdoor unit installation is completed, install an anti-vibration pad (t=20 mm or
more) or an anti-vibration frame to prevent vibration of the outdoor unit from transferring to the base ground.
10. Place the outdoor unit on a H beam or an anti-vibration frame and fix it with the bolt, nut and washer. (The
bearing force has to be over 3.5 kN)
Foundation
Ditch
150mm or more
Outdoor unit installation
Base ground
Foundation
(or H beam or anti vibration
frame)
Outdoor unit
Anchor bolt
Nut, Spring
washer
Foundation (or H beam or anti
vibration frame)
Anti-vibration pad
Over A + 10~20 mm
A
20 mm
Anchor Bolt
Insertion depth
(50mm or more)
Fixing the outdoor unit
A
B
54
C
D
54
Hole on outdoor unit for fixing anchor bolt (4 - Ø12)
Base ground (H-beam or anti-vibration frame)
(Unit : mm)
Classification Small type Large type
Models
AM080/100/120MXWA∗∗
AM200MXWA∗∗/AM300KXWA∗∗
A 770 1100
B 656 995
C 523 515
D 550 550
For adding the anti-vibration frame on the base ground, the specification for the fixing hole depends on the