Do you have a question about the S&C 2020 and is the answer not in the manual?
Warns that interrupters are pressurized and should not be disassembled.
Provides steps for physically installing the operator unit.
Provides steps for installing the interrupter units into their positions.
Guides connecting operator and pole-units via the power train linkage.
Details connecting conductors and removing interrupter containers.
Outlines procedures for operator setup, wiring, and final checks.
Covers replacing covers, inserting fuses, and initiating operation.
Explains the instantaneous trip-free capability of the stored-energy mechanism.
Describes how to operate the circuit-switcher electrically (open/close).
Warns that interrupters are pressurized and should not be disassembled.
Provides steps for physically installing the operator unit.
Provides steps for installing the interrupter units into their positions.
Guides connecting operator and pole-units via the power train linkage.
Details connecting conductors and removing interrupter containers.
Outlines procedures for operator setup, wiring, and final checks.
Covers replacing covers, inserting fuses, and initiating operation.
Explains the instantaneous trip-free capability of the stored-energy mechanism.
Describes how to operate the circuit-switcher electrically (open/close).
Loading...