Edition du 04-2005 Page 10
hase 7
P : 4th upstroke of the vertical shaft . As the upstroke
oth
pstrokes completes, orange 4 is selected.Orange
This description in 7 steps with empty machines departure is the
haft.
iated : 2 half pressed at each downstroke
1 orange cut at each downstroke
.
starts, orange 3 positioned above the knife. Simultaneously, b
half-oranges are positioned above the cones and half -skins of
orange 1 are ejected to the rear of the machine.
As the u
4 positions then by gravity, waiting at the end of the upper
feeding chute and above the dumper.
most appropriate method to explain the different phases, but when
that each of the oranges 5, 6, 7, 8...will be pressed at each downstroke of the vertical s
Please notice : when cycle is init
the cycle is initiated, everyone will notice
2 half ejected at each upstroke.