46
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Round SlimLine/Aluminum Clock - Locally Powered
13) First remove the gearbox pin, then attach a
power connector to the port on the side of
the movement.
14) Lay any excess wiring across the strain relief base, then attach the strain relief to the clock with the two
#6-19x7/16 screws. The strain relief should be tight enough to prevent the wire from sliding.
Black
White
Black
White
Power
Common
CLOCK 1
Gang
Box
Green
Green
Ground
12) Attach the power wires from your kit to the
wires you threaded through the pole.
• Attach the Hot wire to the connector’s black wire.
• Attach the Common wire to the connector’s
white wire.
• Attach the Ground wire to the connector’s
green wire.
Consult the diagram for additional help.
For 24V power use the ORANGE and YELLOW wires
For 110V power use the BLACK and WHITE wires
1
2