53
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Square Clock - Battery Powered
10) Remove the back covers from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
12) Place the cover back onto the battery pack. You should hear a snapping noise as the latches engage.
11) Remove the gearbox pin, then insert the
batteries into the clock. If the clock is within range
of a powered transmitter, the hands should begin to
move within a minute.
1
2