Double Mount Installation - Square Clock - Battery Powered
14) Place the cover back onto the battery pack. You
should hear a snapping noise as the latches engage.
15) Slide both clocks back into their housings. You
should hear a snapping noise as the
latches reengage.
16) If you feel the need to detach the clock
from the housing after the installation has been
completed, use a flat-blade screwdriver on the four
slots around the outside of the housing. You may
hear a snapping noise as the internal
latches disengage.
WALL
CEILING