å
Insert two METAL PINS (1R) into the holes in the
LEFT END (B).
å
Push the UPPER SHELF (G) onto the METAL PINS in the
LEFT END (B).
å
Fasten the UPPER SHELF (G) to the UPPER UPRIGHT (C).
Use two BLACK 1-15/16" FLAT HEAD SCREWS (113S).
å
NOTE: Use the two holes that are drilled completely
through the UPPER SHELF.
å
Insert two METAL PINS (1R) into the holes in the
UPPER SHELF (G).
Step 5
419321www.sauder.com/services
Page 9
B
G
1R
1R
Don't worry. It isn't
Rome. This can be built
in a day.
Finished edge
C
Surface with
more holes
BLACK 1-15/16" FLAT HEAD SCREW
(2 used in this step)
113S